Logo

Shenzhen · 20+ Years Steel Fabrication · ISO9001 + NSF

Our Factory — Direct from Source

Buy directly from the production floor, not a trading company. HPT Kitchen runs a vertically integrated stainless steel fabrication facility with certified material sourcing, in-house tooling, and export-ready crating under one roof.

20+ Years Steel Fabrication
50–200 Factory Team
1 Roof — Design to Crate
22 Pre-Shipment Inspection Points

Factory Direct

Why source from the factory instead of a middleman

Every layer between you and the machine adds cost and hides quality. Going direct removes the markup and the guesswork.

01

Transparent Pricing

Quotes reflect actual material, labour, and finishing cost — not a distributor margin layered on top. Procurement teams compare total landed cost, and we keep the line items accountable.

02

Direct Quality Control

Inspection happens where the steel is cut and welded. You talk to the engineers who build your order, so revisions and clarifications avoid translation loss.

03

Faster Iteration

3D drafts in 3 days and first-piece delivery in 8 days — possible because design, tooling, and production are on the same site with no handoff delay.

04

Full Traceability

Mill certificates follow every material lot from the certified steel mill to the finished unit, so your compliance file is complete before the container loads.

Capability

What happens under our roof

Compliance

Certified and audited for global procurement

ISO9001

Certified quality management system spanning incoming inspection, in-process checks, and corrective action.

NSF

Certified food-zone hygiene — coved corners, seamless welds, and cleanable non-absorbent surfaces.

Material Traceability

Mill test certificates (EN 10204 3.1) documented per lot, available for your compliance file.

Export Docs

Certificate of origin, packing list, and inspection reports sent before container loading.

Request a Factory Quote

Send your drawings or specifications for a same-day quotation

3D drafts within 3 business days and first-piece delivery in 8 days, direct from our Shenzhen production line to your destination port.

Factory — Direct Stainless Steel Fabrication in Shenzhen